Development on the Drift GTR! *Subframe and Stitch Welding*
Posted by
Gruppe S
On
Monday, February 08, 2010
The Gruppe-S.com / Dynamic Autosports / Hankook Tire Drift GTR begins the chassis preparation stage of the development process.
Below: The subframe of the GTR along with the transmission is dropped after was stripped down to it's bare chassis.
The rear section of the under body has been stitched welded by one of our Master Technicians, Adam Depner. Sections of the under body coating had to be grinded off in order to clear the area for a clean weld
After finishing the stitch welding, Master Technician Adam Depner, pictured here, is laying on a coat of primer in order to protect the newly exposed metal from the elements..
We have a long way to go, but be sure to keep checking back for the latest news and photos on the development process of the GTR. We will be documenting the entire development process, from build to test and tune to competition.
-Steven @ Gruppe-S
Below: The subframe of the GTR along with the transmission is dropped after was stripped down to it's bare chassis.
The rear section of the under body has been stitched welded by one of our Master Technicians, Adam Depner. Sections of the under body coating had to be grinded off in order to clear the area for a clean weld
After finishing the stitch welding, Master Technician Adam Depner, pictured here, is laying on a coat of primer in order to protect the newly exposed metal from the elements..
We have a long way to go, but be sure to keep checking back for the latest news and photos on the development process of the GTR. We will be documenting the entire development process, from build to test and tune to competition.
-Steven @ Gruppe-S
Subscribe to:
Post Comments (Atom)
0 Response to "Development on the Drift GTR! *Subframe and Stitch Welding*"
Post a Comment