The chassis prep work continues on the Gruppe-S.com / Hankook Tire GTR. All stops have been pulled and no expense is being spared for the build of this GTR. The cabin portion of the frame has been stitch welded, and the adhesive in the joints of the frame have been grinded out to reduce every last possible ounce of weight off the vehicle.
The main hoop and base plates for the cage have been belt and cut out, and further cage work is being done as this is being written. Every last ounce of possible weight it being taken out of this car.
Check in tomorrow for another update on the progress of the GTR Build.
The main hoop and base plates for the cage have been belt and cut out, and further cage work is being done as this is being written. Every last ounce of possible weight it being taken out of this car.
Check in tomorrow for another update on the progress of the GTR Build.
Subscribe to:
Post Comments (Atom)
0 Response to "GTR Chassis Prep Work Continues!"
Post a Comment